Page 5/9
TIGHTENING OF THE CONTACT
I
II
III
min
10 mm
* Only for
hex SW
70 - 95 mm²
5 mm
1 Install the contact with the contact palm facing the bushing interface.
2 Tighten the contact until the bolt head shears off.
(*) For 70 - 95 mm², tighten again until the second level of the bolt head shears off.
3 After tightening the contact, slide the cable reducer up until it butts against the contact.