Badger Meter Blancett B411-110 User Manual
Badger Meter Blancett B411-110 User Manual

Badger Meter Blancett B411-110 User Manual

Turbine flow meter

Advertisement

Quick Links

Turbine Flow Meter
Top Load 1 in. and 2 in. Meters
User Manual
TRB-UM-02597-EN-01 (September 2018)

Advertisement

Table of Contents
loading

Summary of Contents for Badger Meter Blancett B411-110

  • Page 1 Turbine Flow Meter Top Load 1 in. and 2 in. Meters User Manual TRB-UM-02597-EN-01 (September 2018)
  • Page 2: Table Of Contents

    Turbine Flow Meter, Top Load 1 in. and 2 in. Meters CONTENTS Unpacking and Inspection � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 3 Introduction�...
  • Page 3: Unpacking And Inspection

    Unpacking and Inspection UNPACKING AND INSPECTION Upon opening the shipping container, visually inspect the product and applicable accessories for any physical damage such as scratches, loose or broken parts, or any other sign of damage that may have occurred during shipment� OTEE: If damage is found, request an inspection by the carrier’s agent within 48 hours of delivery and file a claim with the carrier�...
  • Page 4: Preinstallation Considerations

    If this condition is present, consider using a meter possessing superior resistance to pulsation and vibration like the Badger Meter QuikSert Inline Flow Meter� Do not locate the meter or connection cable close to electric motors, transformers, sparking devices, high voltage lines, or place connecting cable in conduit with wires furnishing power for such devices�...
  • Page 5: Installation

    Installation INSTALLATION PRESSURE IN EXCESS OF ALLOWABLE RATING MAY CAUSE THE HOUSING TO BURST AND CAUSE SERIOUS PERSONAL INJURY. AVERTISSEMENT LA PRESSION AU-DESSUS DE L’ESTIMATION PERMISE PEUT FAIRE ÉCLATER ET CAUSER LE LOGEMENT LE DOMMAGE CORPOREL SÉRIEUX. 1� Check the inside of the flow meter for any foreign material� Make sure the turbine rotor spins freely prior to installation�...
  • Page 6 Installation Electronic Isolation and Isolation Valve Flow Monitor Flow Rate Control Valve 10 Pipe Turbine 5 Pipe Diameters Flow Meter Diameters Bypass Valve Figure 2: Meter installation with a bypass line Electronic Control Valve Flow Monitor 10 Pipe Turbine 5 Pipe Diameters Flow Meter Diameters...
  • Page 7: Pressure Drop Chart

    Pressure Drop Chart PRESSURE DROP CHART B411-120 QCM0200 QCM0100 B411-110 Flow Rate (gpm) Figure 4: Pressure drop OPERATIONAL STARTUP Follow these steps when installing and starting the meter� After meter installation, close the isolation valves and open the bypass valve� Allow liquid to flow through the bypass valve for sufficient time to eliminate any air or gas in the flow line�...
  • Page 8: Turbine Assembly Replacement

    Turbine Assembly Replacement TURBINE ASSEMBLY REPLACEMENT The meter uses wear-resistant moving parts to provide trouble-free operation and long service life� Designed for easy field service of a damaged turbine assembly, the repair kits replace only the internal parts, rather than replacing the entire meter� The turbine assembly uses stainless steel alloy construction materials�...
  • Page 9 Turbine Assembly Replacement MPORTANT Before installing the new turbine assembly, note that an arrow is cast or engraved on each component. The arrow indicates the primary flow direction. When reassembled, the arrowheads must point in the direction of the fluid flow. The arrows must also be oriented in the UP position on both rotor supports.
  • Page 10: Specifications

    Specifications SPECIFICATIONS Body 316 stainless steel Rotor C17-4PH stainless steel Hybrid ceramic ball bearing with AMS 5898 duplex Bearing Materials of stainless steel race and stainless steel retainer Construction Rotor Shaft 316 stainless steel Rotor Support 316 stainless steel O-Ring Buna-N Operating Temperature –150…350°...
  • Page 11: Troubleshooting Guide

    Troubleshooting Guide TROUBLESHOOTING GUIDE Issue Possible Cause Remedy Meter indicates higher than Cavitation� Increase back pressure� actual flow rate� Debris on rotor support� Clean meter� Build up of foreign material on Clean meter� meter bore� Install gas eliminator ahead Gas in liquid� of meter�...
  • Page 12 The Americas | Badger Meter | 4545 West Brown Deer Rd | PO Box 245036 | Milwaukee, WI 53224-9536 | 800-876-3837 | 414-355-0400 México | Badger Meter de las Americas, S.A. de C.V. | Pedro Luis Ogazón N°32 | Esq� Angelina N°24 | Colonia Guadalupe Inn | CP 01050 | México, DF | México | +52-55-5662-0882 Europe, Eastern Europe Branch Office (for Poland, Latvia, Lithuania, Estonia, Ukraine, Belarus) | Badger Meter Europe | ul�...