Cleanup; Maintenance - MK Diamond Products MK-5009G Owner's Manual & Operating Instructions

Mk-5000 gas series. 14in, 20in, 24in blade guard
Table of Contents

Advertisement

MK-5000G

CLEANUP

(A)
Clean the Water Pump
suction of all debris.
(D)
Clean the Movable Cutting
Table Guide Rails.

MAINTENANCE

Initial Maintenance
WARNING Turn engine off before servicing saw.
Perform the following after initial purchase and operation of the MK-5000.
(A)
Change engine oil after first
month or first 20 operating
hours. (See Engine Oil Change)
(B)
Place the Water Pump in an ex-
ternal container of clean water.
Run the saw until clear water is
seen at the blade cooling ports
(Approx. 1 minute).
(E)
Clean the Movable
Cutting Table Roller Wheels.
(B)
Check and adjust the Blade
Shaft Belt and Jack Shaft belt
tension following first 48 hours of
operation. (See Belt Inspection)
25
MAINTENANCE
(C)
Clean the Water Basin.
(F)
Clean the remainder of the saw.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mk-5013g

Table of Contents