Construction; Mount Plate - Furuno WR-2100 Installation Manual

Compact x-band dual polarimetric doppler weather radar
Hide thumbs Also See for WR-2100:
Table of Contents

Advertisement

5. Construction

All installation places will be considered for installing DPU, cables, pipes, and mount plate during
the environmental survey.

5.1. Mount plate

<Case 1>
Use pedestal without making a hole.
<Case 2>
The way of using steel frames.
Adjust 4 holes with the mount
plate and the steel frames. Make
holes to the steel frames with
20Φ for M16 Hexagon Bolt to join
with the mount plate.
Open more than 100mm of space.
16
SSE-14-0023_17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents