PTI security systems Falcon XT Installation Manual page 46

Hide thumbs Also See for Falcon XT:
Table of Contents

Advertisement

Site Closeout Checklist (cont'd)
Office Security Alarm:
… Verify that each zone is set up correctly.
… Verify that each zone arms and disarms correctly.
… Verify that the siren is functioning properly.
… Verify that access codes and master codes can be changed properly.
Other Items:
Date of Closeout:_________________________________
Installing Company Sign off:
By signing below, I acknowledge that the listed systems have been installed correctly and are functioning
properly. I certify that the installation meets all applicable codes and is installed to PTI Security Systems'
specifications except where code takes precedence. I certify that a representative of the site has been
trained in the maintenance and operation of the systems.
Signature of Installer
Printed Name of Installer
Site Representative Sign off:
By signing below, I acknowledge that all items checked on the preceding sign off list are functioning
properly and the installation is acceptable.
Signature of Installer
Printed Name of Installer
114A3866.D Revised 7-2017
Appendix
Date
Title
Date
Title
42

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Falcon XT and is the answer not in the manual?

Questions and answers

Related Products for PTI security systems Falcon XT

Table of Contents

Save PDF