NOTE: Factory-supplied vacuum breaker assembly. Field install in vertical orientation with flow arrow up and
piping down so that ball seats with gravity. Equalizer line and trap are field supplied and installed.
LEGEND
S — Supply
R — Return
Union
See Note
Fig. 12 — Control Valves
11