Coil Assembly Removal And Re-Installation - Carrier 40UV075 Installation, Start-Up And Service Instructions Manual

Unit ventilators
Table of Contents

Advertisement

Coil Assembly Removal and Re-installation

(see Fig. 27)
WARNING
Lock out and tag all power supplies to equipment and con-
trols prior to servicing unit. Follow all safety codes. Failure
to do so could result in personal injury.
CAUTION
Turn off all power supplies to equipment and controls. Fail-
ure to do so may cause personal injury or damage to the
unit.
To remove coil assembly:
1.
Turn off power to the unit.
IMPORTANT: Tag each right front panel (40UV) or
middle bottom panel (40UH) for each unit. Panels have
electrical information specific to each unit.
2.
Remove all front (40UV) or bottom (40UH) panels.
Remove end panels.
3.
Remove
1
/
-in. head screws along length of unit that
4
secure coil baffle to blower section. See Item 2 in
Fig. 27.
4.
Remove four
1
/
-in. head screws that connect the blower
4
section sides to the coil section sides. See Item 1 in
Fig. 27.
5.
Remove
1
/
-in. head screws attaching outside air (OA)
4
actuator to damper shaft OR locking quadrant assembly
to damper shaft. Remove OA actuator or locking quad-
rant assembly.
6.
Tag low-limit thermostat wiring and terminals. Discon-
nect low-limit thermostat wiring (right end compart-
ment).
7.
Drain water and/or recover refrigerant in accordance
with all applicable codes. Disconnect piping from coil
connections.
8.
Tag optional electric heat element wire terminations for
later reconnection. Disconnect element wires from elec-
tric heat control box (remove coil baffle for access).
9.
Remove the four
the frame.
10. Remove coil section from frame.
To re-install coil assembly:
1.
Replace coil section into frames assembly.
2.
Tighten the four
frame.
3.
Reconnect electric heat wiring in electric heat control
box.
4.
Reconnect wiring to low limit thermostat.
5.
Replace the four
deck to coil section (two on each side).
6.
Replace coil baffle using
in Fig. 27.
7.
Re-install outside air actuator or locking quadrant handle
using
1
/
-in. head screws.
4
8.
Reconnect piping to coils. If water coil, purge air from
coils and perform hydrostatic test to check for leaks. If
DX coil, perform leak test using nitrogen, and evacuate
and charge per recommended HVAC procedures and all
applicable codes.
9.
Replace coil section side insulation.
10. Replace front (40UV) or bottom (40UH) panels. Replace
end panels. Ensure that tag on each right front panel
(40UV) or middle bottom panel (40UH) matches unit
tag.
11. Restore power to unit.
38
/
-in. nuts retaining the coil section to
5
16
/
-in. nuts retaining coil section to
5
16
1
/
-in. head screws holding the blower
4
/
-in. head screws. See Item 2
1
4

Advertisement

Table of Contents
loading

Table of Contents