Figure 4.9.5-2 A completed four step sequence SFC
Adding a sequence POU to PLC MainTask
configuration
After a successful build, add the sequence POU to PLC MainTask configuration.
To add the sequence POU to PLC MainTask configuration:
1. Double-click MainTask in the Devices view. In the MainTask editor, click Add
Call, see Figure 4.10-1.