Download Print this page

Leica Lino ML90 User Manual page 19

Hide thumbs Also See for Lino ML90:

Advertisement

DE
EN
Checking the accuracy of the vertical plumbing
FR
Set up the instrument on an even and flat surface.
Allow the instrument to level.
IT
ES
Checking the upper plumbing point:
PT
NL
DA
SV
NO
FI
JA
ZH
KO
Checking the lower plumbing point:
PL
HR
HU
RU
CZ
EL
LT
LV
Set up the laser on its tripod or wall mount bracket
EE
near point A1 at a minimum distance of 1.5 m from
point B1. The horizontal laser is aligned in direction 1.
SL
Mark the laser dots A1 and B1 with a pin. Rotate the
SK
instrument by 180° so that it points in the opposite
TR
direction of direction 1. Adjust the instrument so that
BG
Checking the accuracy
RO
B1
B2
max. 2 mm
1.5 m
1
2
A1
A1
1
2
1.5 m
max. 2 mm
B1
B2
the laser beam hits point A1 exactly. If point B2 is no
further than 2 mm away from point B1, then the Leica
Lino is within tolerance.
Should your Leica Lino be outside of the spec-
ified tolerance, please contact an authorised dealer-
ship or Leica Geosystems.
Leica Lino ML series 785880c en
18

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lino ml180