MTU 12V2000Gx6 series Operating Instructions Manual page 185

Table of Contents

Advertisement

Belt length ‒ Application
Drive belt – Battery-charging gen-
erator
Table 15: Specified values ‒ Measuring with preload gauge
7.
Complete final steps.
Final steps
1.
Install protective cover.
2.
Install screws of protective cover.
3.
Install safety equipment (if applicable).
4.
Check function of safety equipment (if applicable).
Measured value
Initial installation (new belt,
runtime 0.5-2 h)
Depression depth: 7.8 mm
Test force: 60 N
MS15054/03E 2018-07 | Battery-Charging Generator | 185
Measured value
(used belt, runtime 500 h)
Depression depth: 8.9 mm
Test force: 60 N