In group stop setups pulsed signals could lead to more frequent false positives.

10.4 Checklist

This list provides an overview of the requirements to be met in installation, commissioning and operation
of the safety function Depending on the application, additional requirements must be met. Complete
this list according to your application.
Risk analysis:
was performed?
requires the use of the safety function "Safe Torque Off"
requires category 3 according to the following classifications:
- PL d (or smaller) according to EN ISO 13849-1
- Category 3 (or smaller) according to EN ISO 13849-1
- SIL 2 (or smaller) according to IEC 61508
considers the stopping behavior of the Agile frequency inverter
permits coasting of the drive to a standstill or requires the installation of a mechanical brake.
considers the access time to the hazard area
defines intervals for regular functional checks of the safety function
Installation:
EMC instructions in the operating instructions considered?
The DC 24 V supply was selected and installed based on the requirements of this manual?
The shield of the 24 V power supply was connected on both sides?
03/18
AGL-STOV0-01SV0-06
37