SMA CLUSTER CONTROLLER User Manual page 71

Hide thumbs Also See for CLUSTER CONTROLLER:
Table of Contents

Advertisement

SMA Solar Technology AG
longer be up to date. This prevents potential yield loss. The fallback must be activated and
configured via the user interface of the Cluster Controller. In the event of an invalid or missing
setpoint and configured fallback, the Cluster Controller only retains the last valid setpoint for a
limited, configurable time. Once this fallback time has elapsed, the Cluster Controller implements
the setpoints that were assigned to the fallback. As soon as a valid setpoint is available again, the
fallback is reset and the Cluster Controller implements the current setpoint.
Requirement:
☐ The activation and the configuration of the fallback must be agreed upon with the grid
operator.
Procedure:
1. Log into the Cluster Controller as Installer.
2. In the system tree, select the Cluster Controller and select the menu Grid management
services in the device menu.
3. Select the parameter group for which the fallback settings are to be made:
• To configure the fallback for the active power limitation, select the parameter group
Active power > Fallback settings.
• To configure the fallback for the reactive power setpoint, select the parameter group
Reactive power > Fallback settings.
4. Select [Edit].
5. Make the desired settings for the fallback:
• In the drop-down list Fallback activated, select the entry Yes.
• In the field Fallback activates after, enter the desired time after which the fallback is to
be activated.
• Depending on the parameter group and the selected setpoint, enter the desired value in
the field Active power or Reactive power or cos Phi.
• If cos Phi is selected as setpoint, select the desired excitation type in the drop-down list
Excitation type.
6. Select [Save].
Fallback in Case of Failure of Speedwire Communication between
Cluster Controller and Inverters
In inverters with Speedwire Webconnect Piggy-Back, fallback in case of failure of
Speedwire communication is not configurable
It is not possible to configure fallback in case of failure of Speedwire communication in
inverters with Speedwire Webconnect Piggy-Back. This kind of fallback is designed for
inverters with Speedwire/Webconnect data module and inverters of the type
Sunny Boy Smart Energy.
With this kind of fallback, you can configure which setpoints the inverters in the system are to
implement if the Speedwire communication between the Cluster Controller and the inverters fails
and the inverters do not receive any setpoints within a configurable time interval.
User Manual
13 Grid Management Services
ClusterController-BA-en-15
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents