BPW ECO Tronic EBS Operating And Installation Instructions page 81

Table of Contents

Advertisement

Preparation
- Determine a suitable mounting point for:
- Soft Docking junction box
- Reversing alarm
Installation
All cables must be installed where suitably protected by the
trailer chassis. Fix all cables every 10 - 15 cm with a cable tie.
Do not fi t the cables onto surfaces that can become hot.
Fixing of cables along with hydraulic fl uid pipes is not allowed.
Unnecessary cables should be fi xed coiled up. Ensure that the
junction box gland nuts are closed correctly.
Installation of Soft Docking Junction Box
The position of the junction box has to be in a suitably protected
position in the rear part of the trailer. The box has to be fi xed
on to the chassis. Position in a rigid location unsusceptible to
large vibration and ensure cables run upwards to the junction
box and are safely installed.
Installation of LED Outline Marker Light
The new LED outline marker lights has to be assembled in the
same locations as the old lamp (ensure that the lights can be
seen from the truck mirrors clearly). The connectors has to be
plugged into the Soft Docking junction box. Please ensure the
existing connections for the old outline marker lamps are sealed.
It is essential that you only use LED outline markers not
incandescent bulbs, they are clearer in daylight and require
less power.
Installation of Reversing Alarm
Fit the reversing alarm in a protected position unsusceptible to
vibration. Normally on the rear light panel or near the rear axle.
When assembling pay attention to the location of the alarm, the
cable entry must be at the top (observe "TOP" on the alarm).
Plug the cable into the Soft Docking junction box.
Soft Docking Junction Box
116 mm - Ø 6 mm
Fig. 142
LED Outline Marker Lights
Fig. 143
Reversing alarm
Fig. 144
5.3 Soft Docking
72.5 mm
Ø 6 mm
79 mm
Ø 6 mm
Entry cable at the top
28.4 mm
81

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for BPW ECO Tronic EBS

Table of Contents