Beko DRYPOINT M eco control Installation And Operational Manual page 41

Drying system
Table of Contents

Advertisement

EN
21. Route the ribbon cable to the right into the cable run
and carefully close the cover of the control unit towards the
front.
22. Screw connect the screws from the hood of the control
unit.
DRYPOINT
M eco control
®
Installation and operation manual
Ø = 2 mm
M = 0,6 Nm + 10 %
41

Advertisement

Table of Contents
loading

Table of Contents