EN
12. Tighten the fixing screws towards the head of the
membrane dryer using an Allen key.
13. Route the ribbon cable to the right into the cable run
and carefully close the cover of the control unit towards the
front.
14. Tighten the screws of the control unit cover using an
Allen key.
DRYPOINT
M eco control
®
Installation and operation manual
Ø = 4 mm
M = 2,5 Nm + 0,5 %
Ø = 2 mm
M = 0,6 Nm + 10 %
33