Beko DRYPOINT M eco control Installation And Operational Manual page 36

Drying system
Table of Contents

Advertisement

Installation and operation manual
Description
1. Unscrew the screws from the hood of the control unit
using an Allen key.
2. Open the hood of the control unit carefully to the back.
Route the ribbon cable to the left out of the cable run.
3. Bring the hood of the control unit into the displayed
maintenance position.
Use a screw of the control unit cover to secure it against
tilting and sliding.
4. Loosen the fixing screws towards the head of the 
membrane dryer using an Allen key.
36
Figure
Ø = 2 mm
M = 0,6 Nm + 10 %
Ø = 4 mm
M = 2,5 Nm + 0,5 %
DRYPOINT
M eco control
®
EN

Advertisement

Table of Contents
loading

Table of Contents