Beko DRYPOINT M eco control Installation And Operational Manual page 31

Drying system
Table of Contents

Advertisement

EN
4. Loosen the fixing screws towards the head of the 
membrane dryer using an Allen key.
5. Lift the control unit.
6. Unscrew the screws from the hood of the new control
unit using an Allen key.
7. Open the cover of the control unit carefully to the back.
Route the ribbon cable to the left out of the cable run.
DRYPOINT
M eco control
®
Installation and operation manual
Ø = 4 mm
M = 2,5 Nm + 0,5 %
Ø = 2 mm
M = 0,6 Nm + 10 %
31

Advertisement

Table of Contents
loading

Table of Contents