EN
4. Loosen the fixing screws towards the head of the
membrane dryer using an Allen key.
5. Lift the control unit.
6. Unscrew the screws from the hood of the new control
unit using an Allen key.
7. Open the cover of the control unit carefully to the back.
Route the ribbon cable to the left out of the cable run.
DRYPOINT
M eco control
®
Installation and operation manual
Ø = 4 mm
M = 2,5 Nm + 0,5 %
Ø = 2 mm
M = 0,6 Nm + 10 %
31