Installation and operation manual
17. Insert the O-rings into the housing bottom.
18. Place the control unit on the housing (DRYPOINT
19. Tighten the fixing screws towards the head of the
membrane dryer using an Allen key.
20. Exchange the cord packing of the cover.
40
M).
®
Ø = 4 mm
M = 2,5 Nm + 0,5 %
DRYPOINT
M eco control
®
EN