Beko DRYPOINT M eco control Installation And Operational Manual page 32

Drying system
Table of Contents

Advertisement

Installation and operation manual
8. Bring the cover of the control unit into the displayed
maintenance position.
Use a screw of the control unit cover to secure it against
tilting and sliding.
9. Insert the fixing screws towards the head of the 
membrane dryer.
10. Insert the O-rings into the housing bottom.
11. Place the control unit on the housing (DRYPOINT
32
M).
®
Ø = 4 mm
M = 2,5 Nm + 0,5 %
DRYPOINT
M eco control
®
EN

Advertisement

Table of Contents
loading

Table of Contents