Operation - Projecta SC300D Instruction Manual

Solar charge remote
Hide thumbs Also See for SC300D:
Table of Contents

Advertisement

Load current icon
The load current icon is displayed if there is discharge current.
Load status icon
Load ON,

OPERATION

Buttons
Esc
The buttons are respectively (from left to right) "ESC", "Left", "Up", "Down",
"Right" and "OK "buttons, the operation is described in the schematic operation
diagram below:
Schematic operation diagram
Main menu
The default entry page is the browse mode. Pressing
correct password to enter the modification mode;
move the cursor,
the cursor is located at the current place;
respectively confirm and cancel the modification of the control parameters.
Main menu
"Up" and "Down" buttons are respectively used to move the cursor to select the menu
items, "OK" and "ESC" buttons are respectively used to enter or exit the corresponding
pages of the menu items.
1. Monitoring
2. Device Info.
3. Test operation
4. Control Para.
6
Load OFF.
OK
OK
Browse
subpages
Esc
Esc
and
buttons could be used to modify the parameter values when
5. Load set
6. Device Para.
7. Device PSW
8. Charge Mode
OK
Edit
parameters
button and inputting the
and
and
buttons could be finally used to
9. Factory Reset
10. Failure Info.
11. Meter Para.
buttons could be used to

Advertisement

Table of Contents
loading

Table of Contents