Time Control - Projecta SC300D Instruction Manual

Solar charge remote
Hide thumbs Also See for SC300D:
Table of Contents

Advertisement

3. Light ON+ timer
Working time 1 (T1)
Working time 2 (T2)
Night time
Light ON
Light OFF
Light ON
Light OFF

4. Time control

Working time 1 (T1)
Working time 2 (T2)
12
Load working period after light control turns
ON load
Load working period before light control
turns off load
Total night time controller get from
calculation (≥3h)
Working Time 1
Night Time
Dusk
Control on/off time of load through
real-time clock mode.
Realize the dual timer function of the
load control through real-time clock mode.
Working Time 2
Dawn
The real working time
of T2 depends on the
Night time, and the
length of T1, T2.
Working time 1 is the
compulsory load working
time interval. Working
time 2 is an optional.

Advertisement

Table of Contents
loading

Table of Contents