9. Installation of the system

9.1 Installation area

Consider the following requirements when selecting the installation area:
Feedwater pressure minimum 1 bar, maximum 6 bar.
The feedwater pressure is not to exceed 6 bar. A pressure reducer must be
installed if the pressure is higher.
Minimum temperature + 2°C.
Level standing surface.
If the system is to be wall-mounted, the wall must be smooth. Please check that the
wall has sufficient weight bearing capacity (system weight, Technical specifications).
A DN 50 floor drain must be available.
Free gravity flow to drain.
Free gravity fall to drain must be ensured!
An electric socket with protective conductor must be available for connection of the
system to the voltage supply (see Technical specifications).
Position the system so that there is no difficulty in separating the device
from the electric mains.
There must be sufficient working space around the system (filter replacement etc.).
The system must be easy to operate and check.
An R 3/4" tap water connector is required.
Thermo Scientific Barnstead Smart2Pure
Ultrapure water system
19