Installing The Svi Ii Ap For Double- Acting Operation - GE SVI II AP-2 Quick Start Manual

Svi ii ap digital positioner
Table of Contents

Advertisement

GE Oil & Gas

Installing the SVI II AP for Double- Acting Operation

This section explains how to mount the SVI II AP for the 84/85/86 kit for double-
acting valve positioner configurations.
To mount the kit:
1. Set valve to the closed position.
2. Install the mounting assembly to the yoke (Figure 14) using helical spring
washer 5/16, flat washer 5/16 and hex screw 5/16-18x44.5 [1.75] LG.
NOTE
Kit Mount
Bracket
Figure 14 84/85/86 Valve
Mount all components snug enough to stay in place but loose
enough to tap with rubber hammer into final position.
30
ValVue SVI II AP Quick Start
Lever
Rod-end

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Svi ii ap-3

Table of Contents