GE Oil & Gas
5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in
the valve closed position (Figure 17) and connect to take-off bracket.
6. Verify lever is in correct position with valve closed. Adjust rod-ends, if
necessary.
7. Mount the SVI-II with M6-1 screws.
8. Cycle the valve open to close verifying proper components movement and
that rod-ends move free and clear from other components.
Figure 17 Magnet Position with Valve Closed
Figure 18 Lever Alignment
ValVue SVI II AP Quick Start
32