Step 2: Pairing Power Optimizers to the Inverter

Step 2: Pairing Power Optimizers to the Inverter
Once all connections are made, all the power optimizers must be logically paired to their inverter. The 
power optimizers do not start producing power until they are paired with an inverter . This step 
describes how to assign each inverter to the power optimizers from which it will produce power.
Perform this step when the modules are exposed to sunlight. If the string length is changed or a power 
optimizer is replaced, repeat the pairing process.
 1.  Perform pairing: Press and hold down the inverter LCD button for about 10 seconds. The following 
message is displayed: 
K e e p
f o r
p a i r i n g ,
t o
e n t e r
R e m a i n i n g :
Keep holding for 5 seconds until the following is displayed:
P a i r i n g
T u r n
 2.  Turn the inverter ON/OFF switch to ON within 5 seconds. If you wait longer than 5 seconds the 
inverter exits the pairing mode. The following message is displayed indicating that the inverter is 
performing the pairing:
P a i r i n g
R e m a i n i n g
58
h o l d i n g
b u t t o n
r e l e a s e
m e n u . . .
3
s e c
S w i t c h
T o
O n
[ s e c ] : 1 8 0
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0