 6.  For creating an RS485 bus - connect all B, A and G pins in all inverters. The following figure shows this 
connection schema:
NOTE
Do not cross-connect B, A and G wires. Do not insert wires into RS485- 2 pins.
 7.  Tighten the terminal block screws.  
 8.  Check that the wires are fully inserted and cannot be pulled out easily. 
 9.  Push the RS485 terminal block firmly all the way into the connector on the right side of the 
communication board. 
 10.  Terminate the first and last SolarEdge device (inverter/Control and communication gateway, etc.) in 
the chain by switching a termination DIP-switch inside the inverter to ON (move the switch up). The 
switch is located on the communication board and is marked SW7. 
NOTE
Only the first and last SolarEdge devices in the chain should be terminated. The other inverters
in the chain should have the termination switch OFF (down position).
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
Chapter 10: Setting Up Communication to the Monitoring Portal
Figure 38: Connecting the inverters in a chain
Figure 39: RS485 termination switch