Assembly Procedure; Glass Jar Installation - Cannon CT-2000 Manual

Constant temperature bath
Hide thumbs Also See for CT-2000:
Table of Contents

Advertisement

6

Assembly procedure

Glass jar installation

WARNING
1. Unpack the bath unit housing
and move it to its permanent
location on a stable labora-
tory bench or table.
2. Remove all eight screws from
the stainless steel top covers
(see Figure 2).
3. Disconnect all external
cabling (probes, heaters, and
float switch) from the upper
rear panel of the CT-2000.
4. Remove the front top cover and rear top cover (see Figures 3 and 4).
Use caution when removing the rear top cover because the tempera-
ture control probes and heating elements are attached to it.
Figure 3: Removing
front top cover
1. Remove the glass jar from its box.
The glass jar is heavy. Use caution when lifting it.
2. Make sure the rubber
support ring is seated
properly around the
bottom jar opening in the
bath unit (see Figure 5).
3. Place the rubber gasket
around the top rim of the
jar (see Figure 6). The
®
CT-2000 Constant Temperature Bath
CANNON
Revision 1.0g—February, 2012; CANNON
2139 High Tech Road • State College, PA 16803 • USA
Figure 2: Detaching top cover
Figure 4: Removing
back top cover
Figure 5: Seating the support ring
®
Instrument Company

Advertisement

Table of Contents
loading

Table of Contents