Cannon CCS-2100 Instruction & Operation Manual

Cannon CCS-2100 Instruction & Operation Manual

Automatic cold-cranking simulator
Table of Contents

Advertisement

CCS-2100/
2100LT
Automatic
Cold-Cranking
Simulator
Instruction
& Operation
Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CCS-2100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Cannon CCS-2100

  • Page 1 CCS-2100/ 2100LT Automatic Cold-Cranking Simulator Instruction & Operation Manual...
  • Page 2: Table Of Contents

    Logging in ......................15 Checking/editing Instrument Settings ..............16 Viewing/editing other setup information .............. 17 VISCPRO software interface elements ................18 Initial Stepper Motor Service (CCS-2100 only) ............... 20 Setting the CCS Set Motor Current .................. 21 ® CCS-2100 with VISCPRO ®...
  • Page 3 Restoring instrument settings from a saved configuration ........51 Calibration ......................51 CCS Calibration Standards ................... 53 ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 4 CCS DATA TABLE Configuring the CCS Data Table ................78 ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 5 APPENDIX A—WEISSENBERG EFFECT APPENDIX B—SAE VISCOSITY CLASSIFICATIONS FROM -10°C to -35°C INDEX ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 6: Introduction/Installation

    CHAPTER INTRODUCTION/INSTALLATION Overview Manual This manual is intended for use with both the CCS-2100 and the CCS- ® 2100LT Cold-Cranking Simulator (CCS) models from CANNON Instrument Company. It provides information about: Installation and operation of the CCS-2100 instruments Standard ASTM testing and methods related to the CCS Calibration of the CCS for the customer’s specific needs...
  • Page 7: Equipment

    Precision The CCS-2100 is designed to produce measurements that meet or exceed the accuracy and precision dictated in ASTM test method D 5293. Temperature range The CCS-2100/2100LT is capable of measuring the apparent viscosity of oils at test temperatures ranging from -5°C to -40°C in increments of 5°C.
  • Page 8: Required Accessories

    45 sample tests. CAUTION The CCS-2100 Series II Controller The liquid level in the waste container should be checked frequently and the container should be emptied prior to multi-sample tests. Required accessories The CCS requires a refrigerated...
  • Page 9: Utilities

    CCS unit. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 10: Unpacking

    1. Carefully remove all components from their shipping cartons. 2. Consult the packing list to ensure that all items listed have been received. The CCS is usually shipped in three packing crates (includ- ing the refrigerated chiller unit, if it is ordered from CANNON ® 3. Notify CANNON ®...
  • Page 11: Positioning Ccs Components

    “D” shaped, and fit only one way). ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 12: Controller Power Distribution

    CCS unit. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 13: Optional Connections For Non-Thermoelectric Operation

    VALVE outlet. Do not circulate methanol refrigerants in thermoelectric instruments! ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 14: Simulator Mechanism/Controller Cable Connections

    CONTROL jack on the Controller (see diagram). 5. Set the Instrument Address on the rear panel of the CCS instru- ment. Ordinarily the address should be set to "0". If other CANNON instruments are to be controlled from the same computer, each instrument must have a unique address.
  • Page 15: Coolant Connections

    INLET, and the hose from the CCS INLET to the refrigerated chiller OUTLET. Refrigerated chiller coolant connections ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 16: Filling The Refrigerated Chiller

    C ° e t i ) s t r e t ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 17: Installing Viscpro Software

    Make certain that you complete the sections on checking instrument settings and calibration data. If you encounter difficulties at any stage in the installation process, call CANNON ® Technical Services at 814-353-8000.
  • Page 18: Specifications

    . t i n ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 19 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 20: Configuring The Ccs

    (see Chapter 11 for information on using the Database Manager software). Follow the procedures in this chapter and the chapter on CCS calibration to verify/edit the instrument and calibration settings to ensure that they conform to the actual characteristics of your CANNON ® instrument. Configuration protection To check the configuration settings for your instrument(s), you must log in to the security system as a manager.
  • Page 21: Checking/Editing Instrument Settings

    The Instrument Settings window ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 22: Viewing/Editing Other Setup Information

    The Tray (Test) Settings window will appear. The Tray (Test) Settings window ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 23: Viscpro Software Interface Elements

    View window Analysis window Status bar The VISCPRO primary display ® ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 24 Check cable connections and make certain the instrument is ON. The Instrument View window ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 25: Initial Stepper Motor Service (Ccs-2100 Only)

    OK to save current values and exit the Tray (Test) Settings window. Initial Stepper Motor Service Prior to performing instrument actions with the CCS-2100 Automatic Cold-Cranking Simulator, you must first home the Sample Tray mecha- nism as follows: 1. Make certain that the chiller is connected and operating properly.
  • Page 26: Setting The Ccs Set Motor Current

    1. Select the Set Motor Current option from the Service menu. The Set Motor Current Service window will appear. 2. Prepare a 60 ml bottle of CANNON ® CL25 viscosity standard and place it in position 1 of the Sample Table. Then press the Start button.
  • Page 27 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 28: Calibrating The Ccs

    Preparing/updating the list of calibration standards ® During installation of your VISCPRO software package, a list of current CANNON CL standards (see table, next page) is automatically loaded ® into the VISCPRO database. Before testing calibration standards, it will be necessary for you to enter the viscosity data from the standard bottles ®...
  • Page 29 A minimum of five oils are required for calibration at each temperature in accordance with ASTM D 5293- 08. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 30: Testing Calibration Standards

    To calibrate the CCS instrument, it is first necessary to test samples of known viscosity at the desired calibration temperatures. Selecting standards ® 1. Assemble a group of CANNON standard oils with known viscosi- ties for calibration. Refer to the table on the previous page when choosing the appropriate CL standards.
  • Page 31 (see next chapter). NOTE CCS-2100 users should place the standards in the sample table in the test sequence indicated, and (if necessary) execute the Stepper Motor Service (see page 19) to home the sampler mechanism.
  • Page 32: Performing The Calibration

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 33: Checking Calibration Accuracy

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 34 R: The displayed value is an indicator of how well the raw data fits the calibration equation using the newest calibration constants. A “perfect fit” value is 1.0000. CANNON recommends an “R” value in excess of 0.9. Acceptable values will vary depending on the user’s application.
  • Page 35: Viewing Current Calibration Constants

    To avoid losing valid calibration data, CANNON ® recommends saving the instrument configuration settings immediately after completing a new calibration (see Saving a configuration).
  • Page 36: Testing Samples With The Ccs

    CCS. Damage to the motor or rotor/stator mechanism may result. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 37 Chapter 3, Calibration) if result variance warrants. 4. Turn on the computer and start the CCS software by double-clicking ® the VISCPRO icon on the Desktop. CCS-2100 users must execute the Stepper Motor Service (see page 19) to home the sampler mecha- nism. NOTES...
  • Page 38 T key to save the entry and move the cursor to the next Sample ID field. Or press R to save the entry. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 39 Tray Status window to verify that the instru- ment is ready for testing. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 40: Test Options

    If the Waste Receiver bottle is overfilled, oil may damage the vacuum pump. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 41: Pausing A Test

    VISCPRO window, is READY. At the conclusion of testing, the sampler mechanism for the CCS-2100 will return to the home position. CCS-2100 users may then remove the Sample Tray from the Sample Table. Empty any remaining oil from used sample vials into the appropriate container(s) for use/disposal, and clean glass vials per approved labora- tory procedures.
  • Page 42: Viewing Results

    (or verify that the option is selected). The CCS Choose Analysis window ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 43 (see graphic, next page). The CCS Data Table ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 44: Using The Ccs Software

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 45 Saved Configurations: The Saved Configurations list box (located directly under the Restore . . . check boxes) allows you to make changes to the current configuration for any networked CANNON ® instrument by restoring any or all elements (Instrument, Tray or Sample) of a saved configuration.
  • Page 46 (functions only when a con- figuration is selected). Accesses context-sensitive help. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 47: Security Options

    Service level permits access to all instrument and security parameters. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 48: Initial Security Setup

    Manager status is neces- sary to change Technician information. Service status is necessary to change Manager information. To obtain Service status, it is necessary to select user CANNON Instrument Company from the Log In window and to type in the current CANNON ®...
  • Page 49: Print/Print Setup Options

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 50: Analysis Types

    The Choose Analysis window provides three options for doing this. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 51: Window Options

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 52: Ccs Module Menu Options

    CCS module menu options ® In addition to the VISCPRO menu functions, unique software applica- tion modules for each type of CANNON ® instrument generate additional interface options. The modules determine the characteristics, function ®...
  • Page 53: Print Instrument And Tray (Test) Settings

    See Checking/editing instrument settings in Chapter 1 for additional information. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 54: Tray (Test) Settings

    However, setting the injection time to “0” will permit ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 55: Saving A Configuration

    5. Click OK to save the configuration. Or click Cancel to exit the Save Instrument window without saving your changes. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 56: Restoring Instrument Settings From A Saved Configuration

    For detailed information regarding the CCS calibration procedure, see Chapter 3, Calibrating the CCS. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 57 Click on Calculate new constants to display new calibration values. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 58: Ccs Calibration Standards

    To access the CCS Calibration Standards window, click Configure and select your CCS instrument. Then click CCS Calibration Standards. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 59: Ccs Choose Calibration Standards

    The CCS software is installed with a standard set of CANNON ® calibration standards and temperatures: To edit the list of calibration standards, triple-click on the desired cell. Then input your information. To save your changes, click Save. To exit the Calibration Standards window without making changes, click Cancel.
  • Page 60: Current Cell Calibration Standards

    For additional information regarding the CCS calibration procedure, see Chapter 3, Calibrating the CCS. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 61: Ccs Setup

    Stepper Motor Service The CCS Stepper Motor Service window provides an interface for initial orientation of the CCS-2100 sampler mechanism. The Stepper Motor Service window also provides convenient controls for relocating the sampler during troubleshooting or diagnostic procedures. The CCS Stepper Motor Service window controls are described below: ®...
  • Page 62: Testing Samples-Software Options

    (Instrument ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 63: Selecting Sample Actions

    Paste Into Selected Samples—pastes selected sample IDs Sequential Sample IDs—Numbers selected samples automatically. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 64 (Configure/CCS Calibration Standards). ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 65 Sequential Sample IDs option is selected. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 66: Copy & Paste Sample Id Data Entry Options

    ID number, click the right mouse button, and select Insert At from the Sample Action options. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 67: Analysis Modules

    Chapter 7, Analysis Configuration Options. For information on a specific analysis module included with your CCS package, see the chapter on the particular analysis. Custom analysis modules may be purchased from CANNON ® Instrument Company.
  • Page 68: Maintaining And Servicing The Ccs

    Chassis houses the primary control and operating systems for the CCS, including the onboard microprocessor. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 69: Waste System

    Do not clean the instrument unless the cell temperature is within 10°C of ambient. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 70: Rotor/Stator Assembly

    Rotor/stator assembly It may be necessary to return the rotor/stator assembly to CANNON ® Instrument Company for service for one of the following reasons: 1. A foreign particle has become lodged between the rotor and the stator, and is preventing rotation.
  • Page 71: Replacing The Vacuum Pump Diaphragm

    9. Replace the top housing, lining up the holes for the four symmetrical Allen-head screws. 10. Replace the screws and tighten securely. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 72: Gapping The Rotor In The Stator Well

    1/16". If it is not, repeat the gap procedure. To restore the gap, repeat steps 3 & 4 above. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 73: Preventive Maintenance

    Clean the fan in the RA box. (It will be necessary to remove the interface box housing to clean the fan. Remove the four screws and lift the housing to access the fan.) Calibrate the CCS instrument. Check accuracy with CANNON ® standards.
  • Page 74: Analysis Configuration Options

    Use the directory tree structure to browse the report options. Click on the icons to reveal/hide analyses. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 75 You may click Cancel from the Save Configuration window to exit without saving configuration changes. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 76: Sorting Analysis Data

    Date Filter tab from the analysis configuration window. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 77: Using The Sample/Error Filter

    S. The underscore (_) is a single-character ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 78: Using The Report/Port Output Filter

    2. Select Configure Analysis from the Analyses options. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 79: Resizing Table Columns

    You may click Cancel from the Save Configuration window to exit without saving configuration changes. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 80: Deleting An Analysis Configuration

    Print range options. Then click OK to print to the selected printer. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 81: Exporting Analysis Data

    Statistical Process Control Long-term Monitoring of Daily Calibration Standards ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 82: Ccs Data Table

    ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 83: Configuring The Ccs Data Table

    The Sample Analysis Configuration window consists of three tabbed pages: ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 84 (sample data, calibration data or both). CCS Report data filter options ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 85 (horizon- tal, vertical or cascade view options are available). ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 86: Error Log Table Analysis

    3. Select the Error Log Table from the list of analyses included in the Basic Package. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 87 Error Log Table and how the data will be displayed. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 88 10. Click OK. The analysis will be performed and displayed using the selected configuration settings. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 89 (horizon- tal, vertical or cascade view options are available). ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 90: Export Analyses

    CR—Carriage Return (returns to the beginning of the line) LF—Line Feed (starts a new line in the report) ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 91: Configuring The Port Export Analyses

    4. Select the desired Data Export analysis option. The CCS Ports Output Configuration window will open. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 92 OUTPUT FOR EACH ADDED PORT MUST BE CONFIGURED SEPARATELY (see note below). ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 93 Format Data Output ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 94 For additional information on creating analyses, see the chapter corre- sponding to the specific analysis. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 95 OUTPUT FOR EACH ADDED PORT MUST BE CONFIGURED SEPARATELY. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 96: Using The Database Manager

    The Database Manager interface ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 97: Changing The Database Directory

    BEFORE using Change Data- base Directory. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 98: Repairing/Compacting The Database

    Database Manager program. Or just close the Database Manager window ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 99 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 100: Replacement Parts List

    Following is a list of CCS replacement parts included with the service kits provided by CANNON ® Instrument Company. Item CIC Part Number KIT, SPARE PARTS (CCS-2100) P75.7000 The following parts are included in both kits: TUBING, 1/8 SUPERTHANE P74.1182.2 TUBING, 1/16 MARPRENE P74.1181.1 FELT PAD P75.2555...
  • Page 101 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 102: Warranty/Return Information

    CHAPTER WARRANTY/RETURN INFORMATION Products limited warranty In addition to other manufacturers’ warranties, CANNON ® Instrument Company (“the Company”) warrants all products (other than reagents and chemicals) delivered to and retained by their original purchasers to be free from defect in material and workmanship for one year from the date of the Company’s invoice to the purchaser.
  • Page 103: Returning A Product To Cannon

    Shipping notification Products returned without prior notification (by either telephone or fax), or without Cannon’s authorization, will not be accepted. The customer may be billed a testing fee if a product is returned to CANNON ®...
  • Page 104: Appendix A-Weissenberg Effect

    Viscoelastic Oils describes procedures for running viscoelastic oils but this procedure is applicable only to the CCS-2B instrument. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 105 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 106 -18°C or at other tempera- tures. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 107 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 108 CCS-2050 General configuration 48, 49 description of 1 Ground (electrical) 4 ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a— November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...
  • Page 109 M M M M M Sample testing 31 Sample Tray aligning on Sample Table 36 Measure Viscosity 58 Sample tray (CCS-2100 only) 6 O O O O O Save Instrument 42, 51 Save New Constants 28 Oil standards 101 Security...
  • Page 110 S (continued) S (continued) S (continued) S (continued) S (continued) Stator 2 Stepper Motor Service (CCS-2100 only) setting home flag for sampler 56 T T T T T Temperature CCS range 2 Temperature probe reseating 65 Test Visc[osity] 28 Tray (Test) Settings 17...
  • Page 111 This page intentionally left blank. ® CCS-2100 with VISCPRO ® Instruction & Operation Manual CANNON Version 2.0a — November, 2010; CANNON ® Instrument Company 2139 High Tech Road • State College, PA 16803 • USA...

This manual is also suitable for:

Ccs-2100lt

Table of Contents