Assembly Procedure; Glass Jar Installation - Cannon CT-1000HT Manual

Constant temperature bath
Table of Contents

Advertisement

6

Assembly procedure

Glass jar installation

CAUTION
1. Unpack the bath unit housing.
2. Move the bath unit housing to its
permanent location on the
laboratory bench.
3. Remove all eight screws from the
stainless steel top covers (see
Figure 3).
4. Disconnect all probes, heaters,
and float switch from the rear
panel.
5. Remove the front top cover and rear top cover (see Figure 4 and 5).
Use caution when removing the rear top cover because the tempera-
ture control probes and heating elements are attached to it.
Figure 4:
Removing front cover
1. Remove the glass jar from its
box.
The glass jar is heavy. Use caution
when lifting it.
2. Make sure the Viton
ring is seated properly around
the bottom jar opening in the
bath unit (see Figure 6).
®
3. Place the Viton
Figure 7, next page). The ends of the gasket should meet with no gap
when placed around the rim. If necessary, trim one end of the gasket
to achieve a snug fit.
®
CANNON
CT-1000HT Constant Temperature Bath
Revision 1.1b—June, 2011; CANNON
2139 High Tech Road • State College, PA 16803 • USA
Figure 3: Removing screws
from top cover
Figure 5:
Removing rear cover
®
support
Figure 6: Checking support ring
rubber gasket around the top rim of the jar (see
®
Instrument Company

Advertisement

Table of Contents
loading

Table of Contents