Location Setup; Foundation - Harsco Industrial SC-1500 Installation & Owner's Manual

P-k sonic gas fired boiler w/ nuro control system
Hide thumbs Also See for SC-1500:
Table of Contents

Advertisement

2.4 Location Setup

Foundation

Provide a firm, level foundation, preferably made of concrete. The P-K SONIC
and upright to function properly. There are s
1/2" anchor bolts. Once the boiler is installed on the foundation and furnished with anchor/lag bolts,
use a bubble level and adjust the anchor nuts until the appliance is secure and level.
QTY 3: 9/16" Holes
for
Anchor/Lag Bolts
(FRONT)
NOTICE! The appliance may be installed on a combustible floor; however, the appliance must
NEVER be installed on carpeting.
NOTICE! This appliance is certified for INDOOR use only!
Revised: June 2, 2017
Released: June 2, 2017
ix 9/16" holes in the base which may be used for 3/8" or
 HARSCO Industrial, Patterson-Kelley 2017
All Rights Reserved.
®
P-K SONIC
Gas Fired Boiler
Technical Service 1.877.728.5351
®
boilers must be level
QTY 3: 9/16" Holes
Anchor/Lag Bolts
1004905978 P-K SONIC NURO Installation and
Owners Manual (Rev F Jun-2017).docx
for
(REAR)
Page 4