Commissioning - Mira Vier Installation Manual

Hide thumbs Also See for Vier:
Table of Contents

Advertisement

COMMISSIONING

Turn on electrical supply to Digital Mixer Valve.
Make sure the end of the hose is in
either the bath, shower tray or other
water catchment area.
Press " " button and reduce
temperature to full cold "CLd". Press
"
" to increase to full flow. For Low
Pressure (pumped) version, let
shower run in order to prime the
pump. For long pipe runs, allow
3 - 4 minutes for priming.
Caution! Risk of product damage.
Do not run Pumped Valve (low
pressure version) without a water
supply for longer than 5 minutes
during priming.
31
1144486-W2-K

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents