Mira Vier Installation Manual page 25

Hide thumbs Also See for Vier:
Table of Contents

Advertisement

Fit Slide Bar Assembly over Wall
Brackets and secure with screws
supplied. (Do not overtighten.)
Connect ceiling extension tube.
Feed plastic pipe up through the slide
bar and extension into ceiling.
Do not allow any debris to block the
plastic pipe.
Note! If plastic pipe requires shortening,
make sure there is enough length to fit
elbow (supplied) or alternative push-
fit/compression fitting (not supplied).
When shortening for use with any
push-fit (e.g. John Guest) fitting, follow
manufacturer's guidelines for finishing
and cleaning the pipe.
Push and twist plastic pipe end until
it "clicks" and locks in place.
Connect plastic pipe in ceiling to outlet
pipe from valve using elbow supplied.
Push all parts together fully and lock
elbow onto pipes using clips supplied.
Connect elbow to Digital Mixer Valve.
Fit an isolating valve between to
enable easy maintenance. (Pipe and
isolating valve not supplied). Lock pipe
to elbow using clip supplied. Follow
manufacturer's guidelines for fitting
alternative push-fit connections and
flexible pipework.
25
1144486-W2-K

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents