Supplementary Technical Information - Worcester Greensource 9,5 Installation Manual

Air to water heat pump with domestic hot water distribution unit
Table of Contents

Advertisement

15.5 SUPPLEMENTARY TECHNICAL
INFORMATION
Maximum water supply pressure to the pressure reducing valve
Operating pressure DHW
Expansion vessel charge pressure
Expansion valve setting
Maximum primary working pressure
Set opening pressure of the combined temperature and pressure relief valve
Expansion vessel, 19 Litres
Tab. 13 Supplementary technical information
Cylinder reheat times, Inner cylinder 151 Litres of DHW.
Full volume heat-up from 15°C to 55°C with a primary
flow temperature of 60°C takes 2 hours and 15 minutes.
Full volume re-heat to 55°C after 70% of the cylinders
contents were drawn off takes 1 hour and 50 minutes
Manufacturer
Appliance: IVT Värmepumpar, part of Bosch
Thermotechnik GmbH Box 1012, SE-57343 Tranås,
Sweden
Cylinder: BoRö Pannan AB Bangårdsv. 1, SE-95231 Kalix,
Sweden
Important note:
Only genuine Bosch Thermotechnology spare parts can
be used with these products.
6 720 641 467 (2010/01)
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818
TECHNICAL INFORMATION
16 bar
3 bar
3 bar
6 bar
2,5 bar
7 bar / 95°C
3 bar
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensource 6Greensource 7

Table of Contents