Commissioning Report - Worcester Greensource 9,5 Installation Manual

Air to water heat pump with domestic hot water distribution unit
Table of Contents

Advertisement

COMMISSIONING REPORT

16
COMMISSIONING REPORT
Customer/system user:
System installer:
Type of heat pump:
Commissioning date:
Other system components:
Outdoor sensor T2
Hot water cylinder temperature sensor T3
Others:
Points to be checked prior to commissioning
Heating system: Filled
Checked
Electric heater set to 4.5 kW: Set
Filters: Checked
Cleaned
Sight glass: Checked
Comments:
Heating system pump G1A/G1B working correctly:
Operating temperature after 10 minutes in heating/DHW mode:
Heat flow out T8:.................. °C
Sensor condensor temp T10:................... °C
Defrost sensor T12:................... °C
System pressure levels checked
Functional test carried out
Ensure that primary circuit has been correctly flushed
Check fan operation on outdoor unit
Check for insulation of pipe work
Check that CANbus is fitted correctly
Check term switches positioned correctly
Check condensation drain operates
Hot water peak set
....................................................................................................................................................
Electricity reading on the house taken
The instructions about how to use the heat pump have been given to the client / to the user
...................................................................................................................................................................................
Documentation about the heat pump has been handed over:......................................................................................
Date and signature of system installer:
Tab. 14
52
For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - info@mytub.co.uk 0844 556 1818
Checked
...............................................................................................................................
........................................................................................................................................
........................................................................................................................
.............................................................................................................................
.......................................................................................................................
................................................................................................................
.........................................................................................................................
......................................................................................................................
Heat pump serial number:
HWDU serial number:
Room temperature sensor T5
Heat carrier pump G2 working correctly:
Heat return in T9:.................. °C
Refrigerant temp T11:.................. °C
.............................................................................................
6 720 641 467 (2010/01)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greensource 6Greensource 7

Table of Contents