Allen-Bradley 1756-CNB User Manual page 83

Controllogix redundancy system
Hide thumbs Also See for 1756-CNB:
Table of Contents

Advertisement

Start of the program in the lower priority
task (for example, the continuous task).
Primary Controller
Secondary Controller
Interrupted Switchover
Interruption by the program
in a higher priority task.
Switchover
occurs.
C.
A. This data is sent to the secondary controller:
• Data from the program in the higher priority task.
• Data from the first part of the program in the lower priority
task.
B. Execution returns to the program in the lower priority task.
C. The secondary controller:
• starts the scan at the beginning of the program that was in
progress in the primary controller during the switchover.
• uses the data from the last update.
In this example, the secondary controller starts the scan with an
image of the data as it was during the primary controller's last
scan.
To prevent a scan from repeating after a switchover:
• look for array shift instructions.
• look for scan-dependent logic.
• take preventative actions
End of the program in a
higher priority task.
A.
B.
Configure and Program the Controller
• This portion of the task is not executed
during this scan.
• Instructions executing at the time of the
switchover do not complete in this scan.
Publication 1756-UM523F-EN-P - December 2006
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents