Rack Mounting - Lanner FW-8896A User Manual

Fw-8896 series high-performance x86 network security appliance platform
Table of Contents

Advertisement

Rack Mounting

Installation Precautions:
Elevated Operating Ambient - If installed in a closed
1.
or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater
than room ambient. Therefore, consideration should be
given to installing the equipment in an environment
compatible with the maximum ambient temperature
(Tma) specified by the manufacturer.
Reduced Air Flow - Installation of the equipment in
2.
a rack should be such that the amount of air flow
required for safe operation of the equipment is not
compromised. Mechanical Loading - Mounting of the
equipment in the rack should be such that a hazardous
condition is not created due to uneven mechanical
loading.
Circuit Overloading - Consideration should be given to
3.
the connection of the equipment to the supply circuit
and the effect that overloading of the circuits might
have on over-current protection and supply wiring.
Appropriate consideration of equipment nameplate
ratings should be used when addressing this concern.
Reliable Earthing - Reliable earthing of rack-mounted
4.
equipment should be maintained. Particular attention
should be given to supply connections other than
direct connections to the branch circuit (e.g. use of
power strips). "
CAUTION :
Slide/rail mounted equipment is not to be used as a
shelf or a work space.
Beginning Rackmount Installation
1. Check the package contents. The supplied mounting
kit shall include the following items:
2 x 438mm Slide-Rails
1 x pack of screws
Attaching the Inner Brackets to the Chassis
2. Turn a slide rail upside down and release the inner
bracket.
3. Slide the inner bracket all the way up to end of the
slide-rail assembly. You may hear a "click" sound.
4. Push the white slide-rail lock outwards as the arrow of
direction below. Then pull the inner bracket out of the
slide-rail assembly.
5. Release the inner bracket as shown below.
6. Align the inner bracket to the side of the chassis and
make sure the screw-holes are matched. Then secure the
bracket onto the chassis with provided screws.
7. Repeat Steps 1 to 5 for another slide-rail and attach its
inner bracket onto another side of the chassis.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents