Using the centrifuge

Pos: 101 /100 Si gma/1 00 BA Ze ntrifugen Sigma (Standardmod ule)/0 60 Betrieb_Spin control L+S/06 0-00 10 Erste Inbetriebnahme @ 27 \mod_ 140531 92001 30_68.do cx @ 1 92437 @ 2 @ 1
6.1

Initial start-up

DANGER
Pos: 102 /010 Universalmodule/
Leerzeile @ 0 \mo d_1202 11624 4500_0.do cx @ 114 @ @ 1
Pos: 103 /100 Si gma/1 00 BA Ze ntrifugen Sigma (Standardmod ule)/0 60 Betrieb_Spin control L+S/06 0-00 20 Eins chalten (a ußer 6-1 6HS) @ 27 \mod_ 140531 920134 0_68.do cx @ 1 92451 @ 2 @ 1
6.2

Switching the centrifuge on

Pos: 104 /010 Universalmodule/
Leerzeile @ 0 \mo d_1202 11624 4500_0.do cx @ 114 @ @ 1
Pos: 105 /100 Si gma/1 00 BA Ze ntrifugen Sigma (Standardmod ule)/0 60 Betrieb_Spin control L+S/06 0-00 20-00 10 Öffne n un d Schließen des Deckels - 1 Schl oss @ 2 7\m od_140 531920 2508_6 8.docx @ 1924 65 @ 3 @ 1
6.2.1

Opening and closing the lid

WARNING
Pos: 106 /010 Universalmodule/
Leerzeile @ 0 \mo d_1202 11624 4500_0.do cx @ 114 @ @ 1
Pos: 107 /010 Universalmodule/
Leerzeile @ 0 \mo d_1202 11624 4500_0.do cx @ 114 @ @ 1
Pos: 108 /100 Si gma/1 00 BA Ze ntrifugen Sigma (Standardmod ule)/0 60 Betrieb_Spin control L+S/06 0-00 20-00 19 Ei nsetzen von Rotoren un d Zubehör (außer 8 K)-------------------------------- @ 27\mod_14 053192 04492_ 68.docx @ 192 493 @ 3 @ 1
6.2.2

Installation of rotors and accessories

Pos: 109 /100 Si gma/1 10 BA Ze ntrifugen Sigma (Projekte)/3-3 0KS_3 -30 KHS/0 60 Betrieb/06 0-00 20-0 020-0 010 Einsetzen des Rotors 3 -30KS _KHS @ 29 \mod _14053 21908 744_68.do cx @ 198023 @ 4 @ 1
6.2.2.1

Installation of the rotor

WARNING
Version 09/2015, Rev. 1.3 of 02/03/2017
Translation of the original operating manual, WZG6003-e150401
Before the initial start-up, please ensure that your centrifuge is properly set up
and installed (see chapter 5 - "Set-up and connection").
Press the mains power switch.
The display then illuminates. The centrifuge is ready for operation.
The lid can be opened if the centrifuge is at a standstill and if the lid key is
illuminated.
Press the lid key in order to open the lid.
The centrifuge cannot be started if the lid is opened.
To close, press with both hands slightly on the lid until the electrical lock is
locked.
Do not place your fingers between the lid and the housing when closing the lid.
Risk of crushing!
Open the centrifuge lid by pressing the lid key.
Unscrew the rotor tie-down screw from the motor shaft (counter-clockwise).
Lower the rotor with its central bore straight down onto the motor shaft.
Tighten the rotor tie-down screw clockwise with the supplied rotor wrench
with 7,5 Nm. In doing so, hold the rotor at its outer rim.
Once a day or after 20 cycles, the rotor tie-down screw must be loosened by some
turns, and the rotor must be lifted and fastened again. This ensures a proper
connection between the rotor and the motor shaft.
6 Using the centrifuge
27