Actuator Check Out Test:
A. Run power panel cycle:
Check each phase feeding power panel
Turn on
Press the reset; insure power on button lights up
Press the power off button
Insure power drops to the unit
Press the power on
Insure power has been returned to the unit
Depress the e-stop
Insure all power has dropped to unit
Reset e-stop
Reset panel
Power unit back on.
B. Power on the router and kiosk:
Check to make sure the router is connected to the tablet
Walk the length of the rail with the kiosk and insure signal does not drop off
Insure that actuator is connected to router
C. Cycle the unit using the hand-held kiosk:
Jog the unit the length of the track to insure there is no binding
If end stops are installed insure that unit stops at end stops
Cycle strap all the way out and make sure the white up limit measurement mark is
visible outside of the units cover
Cycle strap all the way up and make sure approximately 3 inches of strap is hanging
out of the unit
Record amp draw on vertical motor
L1______L2_____L3______
D. Attach spreader bar
Run unit in float mode to both ends of the track
Record amp draws on horizontal motor
L1______L2_____L3______
Technician's name______________________
Signature __________________________
Date_____________________
26
SG360-ISM-004 | REV F