Starting Up The Detector - Alcatel ASM 180 TD User Manual

Helium leak detector
Table of Contents

Advertisement

In G 10, the user will find a view of the operator interface.
It can be used to identify the operational parts of the control panel and
remote control unit.
Power-up
Alcatel - High Vacuum Technology - ASM 180 TD/TD+ - ASM 181 TD+ User's Manual

Starting up the detector

Before starting up the detector, check that
the I/O plug connector is present
(see sheet B 70 ).
Set the circuit breaker switch
to I
The roughing pump is started.
The cycle control button green indicator light flashes.
(around 20s.)
Once the primary pressure (MD4E or CP20)
threshold has been reached, the by-pass valve
opens, the indicator light comes on and
the molecular roughing (MDP) is started.
The molecular pump is in the acceleration phase.
When the by-pass pressure threshold is detected,
the valve closes.
The molecular pump reaches its nominal rotational
speed in 2 to 3 min.
C 10
MDP
OK
MDP
OK
MDP
OK
MDP
OK
1/2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asm 180 td+Asm 181 td+

Table of Contents