Measuring The Operate Limit Of Set Values; Completing The Test; Testing Current Protection Functions; Four Step Phase Overcurrent Protection 3-Phase Output Oc4Ptoc - ABB REG650 Commissioning Manual

Relion 650 series generator protection
Hide thumbs Also See for REG650:
Table of Contents

Advertisement

1MRK 502 049-UEN A
6.4.5.1
6.4.5.2
6.5
6.5.1
6.5.1.1
Commissioning manual
Ensure that the maximum continuous current of an IED does not exceed four times its
rated value, if the measurement of the operating characteristics runs under constant
voltage conditions.

Measuring the operate limit of set values

The load encroachment function has no outputs of its own. It can only
be checked together with the impedance function.
1.
Supply the IED with healthy conditions for at least two seconds.
2.
Apply the fault condition and slowly decrease the measured impedance to find
the operate value for of the phase-to-earth and phase-to-phase loops.

Completing the test

Continue to test another function or end the testing by setting the parameter TestMode
to Off under Main menu/Tests/IED test mode/TESTMODE:1. If another function
is tested, then set the parameter Blocked to No under Main menu/Tests/Function test
modes/Impedance/LEPDIS/LEPDIS:1 for the function, or for each individual
function in a chain, to be tested next. Remember to set the parameter Blocked to Yes,
for each individual function that has been tested.

Testing current protection functions

Four step phase overcurrent protection 3-phase output
OC4PTOC
Prepare the IED for verification of settings as outlined in
verify
settings".
Values of the logical signals for OC4PTOC are available on the local HMI under
Main menu/Tests/Function status/Current/OC4PTOC(51_67,4I>)/OC4PTOC:
1. The Signal Monitoring in PCM600 shows the same signals that are available on the
local HMI.

Verifying the settings

1.
Connect the test set for current injection to the appropriate IED phases.
If there is any configuration logic that is used to enable or block any of the four
available overcurrent steps, make sure that the step under test is enabled (for
example, end fault protection).