Section 1
Introduction
1.3
1.3.1
8

Product documentation

Product documentation set

Engineering manual
Installation manual
Commissioning manual
Operation manual
Application manual
Technical manual
Communication
protocol manual
IEC07000220 V3 EN
Figure 1:
The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the
various tools available within the PCM600 software. The manual provides
instructions on how to set up a PCM600 project and insert IEDs to the project
structure. The manual also recommends a sequence for the engineering of protection
and control functions, LHMI functions as well as communication engineering for IEC
60870-5-103, IEC 61850 and DNP 3.0.
The installation manual contains instructions on how to install the IED. The manual
provides procedures for mechanical and electrical installation. The chapters are
organized in the chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the checking
of external circuitry and energizing the IED, parameter setting and configuration as
well as verifying settings by secondary injection. The manual describes the process of
testing an IED in a substation which is not in service. The chapters are organized in the
1MRK 502 049-UEN A