Keba KeContact P20 Installation Manual page 34

Hide thumbs Also See for KeContact P20:
Table of Contents

Advertisement

Function
Supply (phases)
Phase assignment (*)
Phase L1 at terminal 1
connected
Phase L2 at terminal 1
connected
Phase L3 at terminal 1
connected
(*) Comments:
For load distribution, with 1-phase operating mode, any phase (L1, L2 or L3) of the mains supply line can be
connected to the connection terminal 1.
The determination of which phase of the mains supply line was connected serves for informing the (optional)
load management software in order to facilitate an efficient and proper load distribution.
34 / 48
Installation
PHASES / ONLY FOR LOAD MANAGEMENT MODE
DSW1.3 to DSW1.5
DIP-switch
ON=
only 1
phase
D1.3
OFF= all
3
Phases
D1.4
D1.5
OFF
OFF
ON
OFF
OFF
ON
ON
ON
Figure
Figure

Advertisement

Table of Contents
loading

Table of Contents