Section 3 Operation - FULTON EDR-1000 Installation And Operation Manual

Endura series (edr) condensing hydronic boilers 1,000,000 - 2,000,000 btu/hr
Table of Contents

Advertisement

SECTION 3
EDR-IOM-2014-0318
FIGURE 19 - VERIFICATION PROCEDURE
2. Press the Padlock in the upper right hand corner and enter the password
sola (if not already unlocked) then press Begin down in the lower right
hand corner. Figure 20.
FIGURE 20 - VERIFICATION PROCEDURE
3. The parameters that you changed will appear; verify the change you made
is correct. Then press Yes. Figure 21.
Questions? Please Contact Your Local Manufacturer's Representative
OPERATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Non-Fulton product information is for
reference purposes only. No Fulton
document may substitute for full
review of documentation available
from the component manufacturer.
3-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Edr-1500Edr-2000

Table of Contents