6. Duct Design Scheme
Examples of construction and ventilation pipeline design scheme (Flowering hidden series.)
Construction and ventilation pipeline design scheme
7. Trial Run
Please conduct in accordance with the nameplate of Trial Run Tenor on the electric control box.
Perform the trial run only after the outdoor unit has been powered on for over 12 hours.
Check whether all valves are opened before trial run.
Check the electric safety before trial run.
35