Duct Design Scheme; Trial Run - Sinclair ASDH-96AI Service Manual

High static pressure duct serie
Hide thumbs Also See for ASDH-96AI:
Table of Contents

Advertisement

6. Duct Design Scheme

Examples of construction and ventilation pipeline design scheme (Flowering hidden series.)
Construction and ventilation pipeline design scheme

7. Trial Run

 Please conduct in accordance with the nameplate of Trial Run Tenor on the electric control box.
 Perform the trial run only after the outdoor unit has been powered on for over 12 hours.
 Check whether all valves are opened before trial run.
 Check the electric safety before trial run.
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents