Complete Control Replacement; Power Switch Replacement - Henny Penny LVG-202 Service Manual

Open fryer (gas)
Hide thumbs Also See for LVG-202:
Table of Contents

Advertisement

7-3. COMPLETE CONTROL
REPLACEMENT
7-4. POWER SWITCH
REPLACEMENT
May 2013
1. Remove electrical power supplied to the unit.
To avoid electrical shock or property damage, move
the POWER switch to OFF and disconnect main
circuit breaker, or unplug cord at wall receptacle.
2. Using a phillips head screw driver, loosen (do not remove)
the screw located at the top of the control board.
3. Slide the control board down until the notch is clear of the
screw.
4. Tilt the entire control board down allowing it to rest.
5. Disconnect all connectors from control board. Make note of
the locations of the connectors for the reinstall.
6. Remove the old control board and replace with the new
board.
When plugging connectors onto new control panel, be sure
the connectors are inserted onto all of the pins, and that the
connectors are not forced onto the pins backwards. If not
connected properly, damage to the board could result.
7. Reconnect all connectors.
8. Tilt control board back to factory location and secure with
the screw.
1. Lower the control board (see Control Board Replacement).
2. Press on the switch from the inside of the fryer to release
from the metal shroud.
3. Mark and disconnect the wires from the switch.
4. Connect the wires onto the new switch on the correct
terminals.
5. Press back into factory location.
7-2
Model LVG-202, 203, 204

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lvg-203Lvg-204

Table of Contents