Eaton CH Breaker Panel
Eaton CH Breaker Panel
Each rail within a two-rail system is addressed separately, with
the valid range of addresses being 1 through 8 (dip switches
on the rail)
For a two rail system, the user will select the left rail address using
commissioning and the right rail address will automatically be
addressed as the left rail address + 1
Once commissioned, both addresses will be displayed on the status
screen and both addresses will show taken in the address list when
performing MODBUS commissioning for another device
performing MODBUS commissioning for another device