Page 1
(P/N 818-9010) in the E2 controller. STEP 1: Wiring and Setting the Address of the High Pressure CO2 1. When wiring the RS485 polarity from E2 to the High Pressure CO2 controller: High Pressure CO2 • Verify that the (+) RS485 side of the line is connected to the (-) side of E2 RS485.
Page 9
The contents of this publication are presented for informational purposes only and they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Emerson Climate Technologies Retail Solutions, Inc. and/or its affiliates (collectively “Emerson”), reserves the right to modify the designs or specifications of such products at any time without notice. Emerson does not assume responsibility for the selection, use or maintenance of any product.