6-4-20. FL Selection Arm, FL Relay Gear and FL Joint Arm Assembly
. Removing/Attaching
6-4-21. Rotary Switch, TC Gear and Relay Gear
1. Removing
1 Set the UNLOADING position. (Refer to page 6-4.)
2 Rotary switch, TC gear and relay gear.
HSR-1/1P
HSR-2/2P
2. Attaching
Remove the LM motor block assembly and LM worm
wheel. (To synchronize phase of the pinch driving
system (front side) and the loading driving system
(back side)).
Attach the TC gear, relay gear and rotary switch.
Attach the LM worm wheel and LM motor block
assembly.
PH-A : Page 6-8
PH-D , PH-G : Page 6-9
6-29