Special Relay (Sm) List - Mitsubishi Electric MELSEC-Q Series Programming Manual

Melsap-l
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

Special Relay (SM) List

The following table lists the special relays that can be used in the SFC programs.
Number
Name
SM90
Step transition
watchdog timer START
(corresponds to SD90)
SM91
Step transition
watchdog timer START
(corresponds to SD91)
SM92
Step transition
watchdog timer START
(corresponds to SD92)
SM93
Step transition
watchdog timer START
(corresponds to SD93)
SM94
Step transition
watchdog timer START
(corresponds to SD94)
SM95
Step transition
watchdog timer START
(corresponds to SD95)
SM96
Step transition
watchdog timer START
(corresponds to SD96)
SM97
Step transition
watchdog timer START
(corresponds to SD97)
SM98
Step transition
watchdog timer START
(corresponds to SD98)
SM99
Step transition
watchdog timer START
(corresponds to SD99)
Meaning
Explanation
OFF: Not started
• Switched ON to begin the
(Watchdog timer reset)
step transition watchdog
ON: Started (Watchdog
timer count.
timer start)
• Watchdog timer is reset
when switched OFF.
Set by
Corresponding CPU
(When set)
(1)
U
Appendix 1 Special Relay and Special Register List
(2)
(3)
(4)
(5)
A
APPENDICES
175

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-l series

Table of Contents