Norac UC4+ Installation Manual

Spray height controller. john deere 30 series main lift option
Hide thumbs Also See for UC4+:

Advertisement

Spray Height Controller
John Deere 30 Series Main Lift Option
Installation Manual
Improving the competitiveness of Industry and
Agriculture through Precision Measurement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC4+ and is the answer not in the manual?

Questions and answers

Summary of Contents for Norac UC4+

  • Page 1 Spray Height Controller John Deere 30 Series Main Lift Option Installation Manual Improving the competitiveness of Industry and Agriculture through Precision Measurement...
  • Page 2 Reorder P/N: UC4+BC+JD9-INST Rev C (John Deere 30 Series Main Lift Kit) NOTICE NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information contained...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS INTRODUCTION ..........................1 GENERAL SYSTEM DESCRIPTION ....................2 PARTS LISTS ............................3 HYDRAULIC INSTALLATION ......................5 ELECTRICAL INSTALLATION ......................8 COMPLETING THE INSTALLATION....................9 ELECTRICAL REFERENCE – CABLE DRAWINGS ................ 10 ......................10 ALVE ABLE APPENDIX A – VALVE CONNECTOR CHANGE................11...
  • Page 4: Introduction

    INTRODUCTION Congratulations on your purchase of the NORAC UC4+ Spray Height Controller. This system is manufactured with top quality components and is engineered using the latest technology to provide operating features and reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
  • Page 5: General System Description

    However, NORAC requiring boom movement will need to be cannot guarantee all parts fit as intended due done first. Once the hydraulics have been to the variations of the sprayer by the...
  • Page 6: Parts Lists

    CABLE VALVE UC4 BC MAIN LIFT DT 44863-23 HOSE ASSEMBLY 122R2-06 32 IN L 6FORX 6FORX 44865-37 HYDRAULICS FITTING KIT - JD9 UC4+BC+JD9-INST MANUAL INSTALLATION UC4+ JOHN DEERE 30 SERIES MAIN LIFT KIT 44952D VALVE ASSEMBLY EXPANSION DPC PROP DT...
  • Page 7 Table 2 - 44865-37 (Rev B) - Hydraulics Fittings Kit Details Item Part Number Name Quantity Picture 104586 TEE ADAPTER - 6FORXR 6MORT 44917 MALE ADAPTER - 6MB 6MOR 44926 ORIFICE INSERT 3/64" 104369 PLUG - 6MBP Fitting Name 6 M B - 6 M OR X 90 Example: ANGLE SIZE IN...
  • Page 8: Hydraulic Installation

    Figure 2 - Third station expansion block assembly 1. On a clean surface remove all plastic plugs from the NORAC expansion valve 5. Remove the three 4MBP plugs from the block (V01). UC4+ 2 station valve block. 2. Install the 6MBP (F09) into the A port of the expansion block (Figure 2).
  • Page 9 Make sure the o-rings are properly seated. Figure 6 - Attaching two expansion valves 9. Attach the expansion block to the UC4+ Figure 4 - Expansion valve O-ring block using the included spring washers placement and nuts. 7. If this is the only expansion block 10.
  • Page 10 12. Attach hose H03 to port B on the 14. Attach the hose (H03) to the 6FORXR expansion block. Route the free end of 6MORT tee fitting (F03). the hose (H03) to the John Deere main lift tee, which is located on the right You must ensure no hydraulic hand end of the John Deere valve block components will interfere with any...
  • Page 11: Electrical Installation

    ELECTRICAL INSTALLATION 3. Install the two square DIN connectors on Cable C17 is the only cable the end of cable C17 to the expansion included in the kit. block. 1. Connect the six pin shroud (T6B) to the mating tower on the valve extension The connector marked “Main cable (previously installed).
  • Page 12: Completing The Installation

    COMPLETING THE INSTALLATION You can now continue to install the remainder of your UC4+ Spray Height Control System. If the system is fully installed then refer to the UC4+ Operators Manual to run an Automatic Install with the JD9 type selected.
  • Page 13: Electrical Reference - Cable Drawings

    ELECTRICAL REFERENCE – CABLE DRAWINGS 7.1 V ALVE ABLE...
  • Page 14: Appendix A - Valve Connector Change

    APPENDIX A – VALVE CONNECTOR CHANGE Starting in January 2009, NORAC is changing the connectors on the boom height control valve block. The new style valve block will have 2-pin Deutsch connectors on the coils. The previous models had Hirschman style connectors and the new style valve blocks and cabling have Deutsch connectors.
  • Page 16 Canada NORAC Systems International Inc. CALL TOLL FREE: 1-800-667-3921 (306)664-6711 SHIPPING ADDRESS: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States Norac, Inc. CALL TOLL FREE: 1-866-306-6722 (763)786-3080 SHIPPING ADDRESS: 1290 Osborne Rd NE, Suite F Fridley, MN 55432-2892...